Introduction

image

Hydro Survey played a crucial role in the Rosslare Dredging Project, undertaken by Iarnród Éireann in August and September 2024. To ensure strict adherence to the Ports EPA Dumping at Sea permit, Hydro Survey conducted comprehensive pre- and post-dredging surveys, including turbidity monitoring and sediment sampling.

 What we did · What we did · What we did ·

 What we did · What we did · What we did ·

 What we did · What we did · What we did ·

What we delivered

Throughout the dredging campaign, daily multibeam and turbidity surveys were carried out to monitor the impact of dredging activities on the marine environment. By meticulously collecting and analysing this data, Hydro Survey helped Iarnród Éireann maintain environmental compliance and minimize any potential negative effects on the local ecosystem.

image

Budget

n/a

Deadline

2024

image
image
image

Hydro Survey have a long history of supporting the dredge industry in Ireland and the UK. We have worked across all major ports and harbours and provide a comprehensive survey solution.

Trusted by

image image image image image image image image
image image image image image image image image
image image image image image image image image

Our Clients Say

WORK WITH US

 

Sorensen Civil Engineering has used Hydro Survey on many of our marine and land-based projects. Hugh and is team have and continue to provide an excellent service and are extremely professional in their project delivery.

— Brian Snow

Operations Director | Sorensen

We engaged Terra Survey to undertake an extensive geophysical survey of existing flood defences predominantly to the west of Limerick City. We were particularly interested in understanding the depths of any soft soils and the potential presence of karstic features in the bedrock. Terra Survey reviewed our proposed survey and advised on tweaks to optimise the survey to ensure we gathered all of the required information. Terra Survey’s site team undertook the survey promptly in very challenging terrain. The report produced by Terra Survey on completion of the fieldworks was to a very high standard. We were delighted with Terra Surveys inputs to the project and we look forward to working with them again in the near future.

— David Mills

Principal Engineer | RPS