Hydro Survey played a crucial role in the Rosslare Dredging Project, undertaken by Iarnród Éireann in August and September 2024.
To ensure strict adherence to the Ports EPA Dumping at Sea permit, Hydro Survey conducted comprehensive pre- and post-dredging surveys, including turbidity monitoring and sediment sampling.
Throughout the dredging campaign, daily multibeam and turbidity surveys were carried out to monitor the impact of dredging activities on the marine environment. By meticulously collecting and analysing this data, Hydro Survey helped Iarnród Éireann maintain environmental compliance and minimize any potential negative effects on the local ecosystem.